What this lesson is about
Operations turns inputs into output. Quality is cheapest when built in, and risk is managed by deciding in advance which ones you will carry.
Part 1 of 3
Operations, is, all, about, converting, inputs, into, outputs., It’s, the, arrangement, of, everything, that, happens, in, between., Productivity, measures, how, efficiently, that, conversion, takes, place., You, get, it, by, dividing, output, by, the, input, used., Labour, productivity, looks, at, output, per, worker-hour., This, matters, because, rising, productivity, is, the, only, way, a, business, can, pay, employees, more, without, raising, prices, or, shrinking, profit, margins.
Productivity, isn’t, just, about, working, harder., Usually,, it, improves, with, better, tools,, improved, processes,, better, training,, or, by, cutting, unnecessary, steps., That’s, why, a, company, that, thinks, “work, faster”, is, the, answer, to, a, productivity, issue, has, probably, got, it, wrong.
Quick check
Labour productivity is measured as
It expresses how much output each hour of work produces, which is what determines whether wages can rise without price rises.
Part 2 of 3
When, we, talk, about, quality,, a, key, concept, to, understand, is, the, cost, of, quality,, which, falls, into, three, categories., Prevention, costs, are, what, you, spend, to, stop, defects, from, happening., This, includes, training,, better, design,, and, decent, equipment., Appraisal, costs, go, to, finding, defects, through, inspection, and, testing., Finally, failure, costs, come, into, play, once, defects, exist., These, can, be, internal, (like, scrap, and, rework, before, shipping), or, external, (like, returns,, warranty, claims,, and, damage, to, reputation, after, shipping).
Here's, a, consistent, rule, to, remember:, the, later, a, defect, is, caught,, the, more, it, costs., A, design, flaw, found, in, the, design, phase, is, cheap, to, fix., If, it’s, caught, on, the, production, line,, it, gets, expensive., But, if, a, customer, finds, it,, the, costs, can, include, repair,, replacement,, damage, to, the, relationship,, and, the, stories, shared, with, others., This, is, why, quality-focused, firms, invest, heavily, in, prevention, and, consider, inspection, a, backup,, not, a, strategy.
Quick check
Rising productivity matters because it allows a business to
More output per hour creates the room for higher pay that would otherwise have to come from customers or from margin.
Part 3 of 3
Risk, management, involves, three, steps., First,, identify, what, could, go, wrong., Next,, assess, each, risk, based, on, its, likelihood, and, potential, impact., Finally,, choose, a, response:, you, can, avoid, it, reduce, it, transfer, it, (like, through, insurance, or, contracts),, or, accept, it., Accepting, a, risk, is, a, valid, choice., It’s, not, the, same, as, ignoring, it;, an, accepted, risk, has, been, identified,, sized,, and, consciously, taken, on.
Quick check
Costs incurred on training and better design to stop defects arising are classified as
Prevention spending is aimed at stopping the defect existing at all, ahead of any inspection.
Test what you just learned. Correct moves you up, wrong moves you down - reach 100 to master this lesson.